New bathrooms, en-suites and wet rooms across Hull and East Yorkshire, tiled and plumbed by the same team from strip-out to the last bead of silicone. No waiting on a separate tiler or sparky to turn up.

Strip-out, first fix, boarding, tiling, suite and second fix handled end to end. The room is left clean, sealed and ready to use the day we finish.
Fully tanked wet rooms and low-profile walk-in showers. The waterproofing you never see is the part we never rush.
Walls and floors in ceramic, porcelain and large-format tile, set out from the centre of the room so the cuts land where you will not notice them.
Squeezing an en-suite into a bedroom corner or a WC under the stairs is detail work: routing pipework, planning falls and using every inch of the space.
Most full bathroom refits take two to three weeks depending on the size of the room and the amount of tiling. We confirm the timeline in writing before we start and keep the site tidy at the end of every day.
Yes, as long as the floor structure is sound and the tanking is done correctly. We tank the whole wet zone and test the falls before tiling, which is exactly the part you do not want done cheaply on a first floor.
Either works. We can supply the bath, shower, basin and brassware at trade prices, or fit a suite you have already bought. We will tell you honestly if something you have picked will not stand up to daily use.